This item is under embargo and not available online per the author's request. For access information, please visit http://digital.wustl.edu/publish/etd-search.html.

Publication Date

Summer 8-12-2020

Document Type

Final Report

Problem Statement

This document presents a design for a temporary, rapidly built, overflow hospital needed during a pandemic similar to the recent Covid-19 crisis. The design focuses on the HVAC system for a rapidly built hospital to fit the needs of patients and staff when treating an airborne disease similar to Covid-19. Enclosed in the report is the design decisions for the layout, size, and amenities of the hospital. HVAC layout, load calculations, and sizing can be found in the document. Calculations were made based on the St. Louis, Missouri area, but the design was set up to be adaptable to fit a variety of locations, with a variety of needs.

Author's School

McKelvey School of Engineering

Author's Department

Mechanical Engineering and Materials Science

Class Name

Mechanical Engineering Design Project (UMSL JME 410)

Available for download on Monday, August 12, 2030

Share

COinS