This item is under embargo and not available online per the author's request. For access information, please visit http://digital.wustl.edu/publish/etd-search.html.

Publication Date

Summer 8-13-2020

Document Type

Final Report

Problem Statement

Project consists of commercial technology review and siting capacities associated with new stream reach development in Missouri area. Operations within a smaller footprint and utilization of zero head turbines will determine possible hydropower installation. Preparation of an all inclusive development report detailing project schedule, associated risks, and itemized cost estimate are present.

Author's School

McKelvey School of Engineering

Author's Department

Mechanical Engineering and Materials Science

Class Name

Mechanical Engineering Design Project (UMSL JME 410)

Available for download on Monday, August 12, 2030

Share

COinS