Problem Statement
Project consists of commercial technology review and siting capacities associated with new stream reach development in Missouri area. Operations within a smaller footprint and utilization of zero head turbines will determine possible hydropower installation. Preparation of an all inclusive development report detailing project schedule, associated risks, and itemized cost estimate are present.
Class Name
Mechanical Engineering Design Project (UMSL JME 410)
Recommended Citation
Rojas, Laura Vanessa; Roth, Patrick; and Holloway, Otis, "Missouri New Stream Development" (2020). Washington University / UMSL Mechanical Engineering Design Project JME 4110. 36.