Files

Download

Download Full Text (1.4 MB)

Project Location

Dhahran, Saudi Arabia

Year of Completion

2017

Building Type

Institutional

Building Massing

High Rise

Project Architect

zhuoying chenFollow

Owner

Saudi Aramco

Student Author

Zhuoying Chen

Archived Year

12-4-2018

Climate

Bwh (Tropical and Subtropical Desert Climate)

Application

facade

Material and its Properties

stainless steel tubes • easy to bend and form shapes • adjust temperature, isolate from the heat • durable • futuristic, elegant, immaculate uniform"

Manufacturer

Seele

Location of Manufacturer

Gersthofen, Germany

Architect Website

https://snohetta.com/?

Manufacturer Website

https://seele.com/

Environmental Response

The tubes were attached to the outer shell of the building so that there is no pressure or thermal movement between the shell and the pipes - an essential feature, considering the daytime temperatures of 45°C in the shade.3D-planning and parameterization of the construction lower the risks during installation and save materials.

King Abdulaziz Centre for World Culture

Share

Case Study Location

 
COinS