Files

Download

Download Full Text (777 KB)

Project Location

Kandalaksha, Murmansk, Russia

Year of Completion

2018

Building Type

Temporary

Building Massing

Low Rise

Project Architect

BIO-Architects

Architect Location

Moscow, Russia

Student Author

Sheng Yan

Archived Year

12-4-2018

Climate

Subarctic Climate (Dfc)

Application

Exterior, Interior, Structure

Material and its Properties

Steel in forms of exterior cladding, structure and interior finishes were used to guarantee minimum weight, therefore the hut’s deployability by helicoptors to Russia’s remote north.

Architect Website

http://www.bio-architects.com/

Other Sources

https://www.archdaily.com/895701/ dubldom-in-kandalaksha-bio-architects

Environmental Response

high-value insulation is embedded within the wall assembly, which is protected by the steel sheathing from both outside and inside.

DublDom

Share

Case Study Location

 
COinS