Project Location
Gangnam-gu, Seoul, South Korea
Year of Completion
2016
Building Type
Commercial
Building Massing
High Rise
Architect Location
Atlanta, GA
Archived Year
12-7-2018
Climate
Humid continental climate
Application
Steel_Stainless steel
Material and its Properties
The building features a Zahner engineered cladding system and custom bumped and perforated stainless steel throughout the interior and exterior.The metal system Zahner provided was developed with a deep recess cavity for the lighting system.Plus they’re energy efficient.
Manufacturer
Zahner
Material Brand
Zahner
Location of Manufacturer
Kansas City, MO, USA
Fabricator
N/A
Location of Fabricator
N/A
Architect Website
http://www.beckgroup.com/
Manufacturer Website
https://www.azahner.com/
Fabricator Website
N/A
Other Sources
https://www.archdaily.com/877264/harim-group-headquarters-building-the-beck-group https://www.azahner.com/works/harim-tower
Environmental Response
N/A
Recommended Citation
Hua, Yinghua, "Harim Group Headquarters Building" (2016). Building Case Studies. 271.
https://openscholarship.wustl.edu/bcs/271
Owner
Harim Group company