Files

Download

Download Full Text (683 KB)

Project Location

Porto, Portugal

Year of Completion

2010

Building Type

Temporary

Building Massing

Pavillion

Project Architect

Yinghua HuaFollow

Architect Location

San Francisco, CA

Owner

Ae FAUP

Student Author

Hua yinghua

Archived Year

12-7-2018

Climate

Mediterran Climate

Application

Plastic

Material and its Properties

When applying the TUBE-IT system, the chosen main material - corrugated tube - is rolled up around a given existing structure in a helicoid manner. In addition to its structural purpose - i. e. to attach the different tube layers to each other as well as to the structure itself - the plastic clamps enhance the desired visual impact of the whole. This kind of tube, usually used in construction with an infrastructural role, becomes the design’s primary element.

Manufacturer

N/A

Material Brand

N/A

Location of Manufacturer

N/A

Fabricator

N/A

Location of Fabricator

N/A

Architect Website

http://www.doesarchitecture.com/

Manufacturer Website

N/A

Fabricator Website

N/A

Other Sources

https://www.archdaily.com/191018/bluetube-bar-dose

Environmental Response

N/A

Bluetube Bar

Share

Case Study Location

 
COinS